Results 121 to 140 of 147
-
07-30-2012, 08:17 AM #121
Thanks! I think I'd go so far as to say that this extra half-twist is "right" and the way I (and a number of other people, apparently) have been doing it is not right. I haven't tried the locking version myself yet, but I see what's going on by looking at your picture. I'll try to color that picture a little later so everyone else can see how it works a little more easily. I'm going to remove my video because I don't want to perpetuate the non-locking way of rigging an eight block; I'll edit my previous post to include a note of what it used to contain.
Last edited by bjp; 07-30-2012 at 10:40 AM. Reason: Oops, extra word removed
-
07-30-2012 08:17 AM # ADS
-
07-30-2012, 09:46 AM #122
Seems like, using the Jester rigging there is a touchy balance. The friction has to be low enough so that once you have changed to a lower, the lower works. Which means other versions that lock become a problem, because they then do not convert easily to a lower. Or you can lock off one side, but then you do not have a dual-line system, so use a different contingency system.
Very hard to set up the dual-line easily convert to lower system. Hard to say why one would want that - I don't. In a true Class C, seems unlikely to use the dual-lines (but could). Having another person on the other rope would delay applying the contingency to an under-water canyoneer who needs to be lowered.
If I really wanted dual lines in a Class C situation, I think I would set up two separate systems, with contingency.
But why are people setting up contingency anchors in Class A canyons? Perhaps I am floggin this horse again and again and again, but... seems like setting up dual lines using a Stone, and having your conversion to a lower from a Stone practiced and polished is going to be, long term, a better system than setting up a dual-line pseudo-contingency system like the Jester, that has some problems with small-diameter ropes.
Tom
-
07-30-2012, 10:02 AM #123
Agreed. Also having something simple you can visually inspect and know (at a glance) if it's either right or wrong is mandatory IMO. This whole "maybe with this size rope, maybe not with this size rope" argument when your life is on the line is pretty lame IMO. Just to save a minute "maybe" in a class C canyon? Yeah I'll pass..... Stone knot all the way.
Your safety is not my responsibility.
-
07-30-2012, 10:03 AM #124
I thought I knew how to rappel, but after reading this thread, I've come to the conclusion that I don't know jack.
Utah is a very special and unique place. There is no where else like it on earth. Please take care of it and keep the remaining wild areas in pristine condition. The world will be a better place if you do.
-
07-30-2012, 10:22 AM #125
-
07-30-2012, 11:17 AM #126
-
07-30-2012, 11:23 AM #127
You have that argument every single time you select the rigging style for your rappel device. Having it one more time for the block may or may not be appropriate depending on the circumstances.
In a class C canyon, the rappeller would presumably be unable to breathe for that minute. Contingency riggings are good ideas in C canyons, even if not the Jester.
-
Post Thanks / Like - 1 Likes
Deathcricket liked this post
-
07-30-2012, 12:27 PM #128
I do agree with you, yes. Nothing wrong with what you said. But if you start a rap and your device needs more friction, there are many ways to correct the situation. If you start a rap using the joke(r) and it starts to slip, you simply splat on the ground. IMO this is a huge distinction and why one side should always be tied off. *shrug*
Your safety is not my responsibility.
-
07-30-2012, 12:45 PM #129
[QUOTE=ag23;505440][B]Hello,
[FONT=Arial]IYour safety is not my responsibility.
-
Post Thanks / Like - 1 Likes
bjp liked this post
-
07-30-2012, 01:10 PM #130
-
07-30-2012, 02:03 PM #131
X3
Thanks Andre
Sent using Tapatalk
-
07-30-2012, 02:16 PM #132
x4
what they said- Gavin
-
07-30-2012, 02:24 PM #133
Went out and played with this in my garage. I can see why the Card Shark likes this. It is easy to set up and doing everything I could from swinging to jumping up and down I could not make it slip. Obviously it will because someone is wearing a cast but I could not get it to budge one inch. I also set it up using my ATS and seems to work the same. If you had the first guy down rappel double and then belay the lines I would have no concern using it. I shot a video of how I think you make it release but I cannot get it to load. Without removing the unloaded strand from the biner I could not get it to slide. Once you remove unloaded strand you can lower. I am using an 8.3 canyon fire rope. How do I get a video from my I phone which is downloaded onto my computer upload here?
Mark
Here is the video not the best but gives an idea of how the jester is suppose to be released.
http://www.youtube.com/watch?v=n5l8LJ9RM2g&feature=plcp
I just went over to the ACA site and looked at a picture that was hard to understand but it looks like you are suppose to feed the non loaded strand without removing it from the biner? I tried that with my test and could not make it slipped that way. So at this point just take the video as entertainment only, have no clue how you are suppose to lower a victim.
Mark
-
07-30-2012, 02:31 PM #134
X5.
Not a lot of threads get me to the hangboard to practise rigging configurations. Good fodder.
Thanks!
-
07-30-2012, 02:51 PM #135
-
07-30-2012, 06:00 PM #136
I used it in Plaquette mode. I asked the question of how to rig it a year or two ago (??) on the ACA website (the master Totem thread) and followed your example. I think it worked great at first, but as the Totem wore-in a bit, it slipped. I really like the versatility and it still works great with my 9 MM rope. Also, for the record, I don't use it often at all in ascending (plaquette) mode- Just messing around with it in practice sessions in case I needed it for real out in the field.
-
07-30-2012, 08:28 PM #137
It sounds like your friend was very lucky with the ledge and quick sar response. One question i had, is the jester supposed to work just as good on say 30' of rope as 100'? It seems like the weight of the rope could add friction to the system too.
Also, thinking that since something has worked successfully many times in the past then it will continue to work successfully in the future seems risky to me. Every system has some failure mode. Its a balance of risk to reward.
-
07-31-2012, 07:38 AM #138
OK, I'll bite. Sometimes in class A and B canyons, you can't see the bottom of the rappel. In this situation, we often use a contingency 8 to lower the first person down in order to set rope length. Or, if we "think" we have the rope on the bottom, but aren't quite sure, we will go ahead and rig the 8 block so that the first person doesn't have to ascend back up when the rope is actually not on the ground.
Overall, we use biner blocks as the go-to, but the 8 does come in handy from time to time. Unless the pull is completely clean, we even change out the 8 to a biner block for the pull. I have found that 8 blocks dragged over sandstone = mucho sheath damage. Biner blocks do not seem to share this issue.
While I was shown the Stone and Joker in canyoneering merit badge school, I have never seen the need to rig either one. Having two ropes hanging down the pitch is not usually something we find desirable. But, it depends on everyone's personal situation. We don't do any guiding, and everyone we canyon with is capable of rigging their descender in 7 seconds or less, so the advantages of dual line systems don't really add up to much for us.
-
Post Thanks / Like - 1 Likes
MrAdam liked this post
-
07-31-2012, 07:55 AM #139
Double strands help move large groups thru a canyon, especially Youth Groups. If the anchor is bomber you can have two Youth rappeling at the same time. If one Youth is extremely slow several other Youth may descend the other strand while the other Youth is still on Rappel. When the group is big and the anchor can support it, it is the only way to fly.
If your group is experienced and you cannot see the bottom just drop the bag and biner block it. Adjust for pull at the end.
Mark
-
07-31-2012, 07:59 AM #140
except...block before drop
Similar Threads
-
Boss Hog Accident report 03/31/12
By rick t in forum CanyoneeringReplies: 26Last Post: 04-05-2012, 02:24 PM -
NSS Accident Report
By RedRoxx in forum Climbing, Caving & MountaineeringReplies: 2Last Post: 03-31-2010, 04:05 PM -
Zion Rappel Accident
By Iceaxe in forum CanyoneeringReplies: 90Last Post: 06-24-2009, 07:14 AM -
NSS accident report
By RedRoxx in forum Climbing, Caving & MountaineeringReplies: 3Last Post: 06-08-2007, 06:20 AM -
Failure to Communicate
By Sombeech in forum JokesReplies: 1Last Post: 07-17-2006, 05:39 PM