Results 1 to 3 of 3
Thread: Moab Bridge Open
-
02-08-2010, 03:36 PM #1
Moab Bridge Open
I left Moab at 2pm crossing the old river bridge and 2 hrs later came back across the new one. The old bridge will be torn down in the coming weeks to make way for the new north bound bridge, 2 lanes each way - someday.
-
02-08-2010 03:36 PM # ADS
-
02-08-2010, 04:42 PM #2
How much snow is on the ground?
-
02-08-2010, 04:48 PM #3
The snow from the last 2 days is melting rapidly. I was up at Poison Spider today and the trails are pretty muddy, watched a couple of trucks turn back, couldn't get up the muddy grade. North facing slopes still have a few inches.
Similar Threads
-
Burning our own bridge
By jiveassmother in forum CanyoneeringReplies: 6Last Post: 06-30-2010, 05:24 PM -
Bridge over the Temple
By oldno7 in forum General DiscussionReplies: 5Last Post: 02-07-2010, 03:13 PM -
[Trip Report] TR: Hurst Bridge
By Udink in forum Hiking, Scrambling & Peak BaggingReplies: 10Last Post: 10-20-2008, 07:34 AM -
Bridge prank
By Sombeech in forum General DiscussionReplies: 0Last Post: 05-22-2006, 09:45 PM -
[Trip Report] Hurst Bridge
By Iceaxe in forum Hiking, Scrambling & Peak BaggingReplies: 2Last Post: 02-19-2006, 10:26 AM
Visitors found this page by searching for:
Outdoor Forum